Hydro-Electric Projects in Honduras Lacking Funds

Excerpts from Minerco Resources – MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS: “We currently have an interest in two Hydro-Electric Projects and one Wind Project in various parts of Honduras. Both of our Hydro-Electric projects are classified as run-of-the-river projects (not conventional retention dams). Our Chiligatoro Hydro-Electric Project is in the […]

Airports Service Restored

The authorities of the Directorate General of Civil Aeronautics, DGAC, announced that morning flights at Toncontín airport in Tegucigalpa, Golosón in La Ceiba, and the runway in Roatán have resumed. Airports were closed for a little more than two hours due to limited visibility and drizzling rain.

Airports Temporarily Closed in the A.M.

The airports of Toncontín in Tegucigalpa, Golosón in La Ceiba, and the airstrip in Roatán are temporarily closed this morning due to little visibility and drizzling rain caused by a high pressure front. San Pedro Sula‘s Ramón Villeda Morales, however, continues to operate international flights. Civil Aeronautics authorities explained that later in the morning the […]

Brazil’s Koblitz Planning Renewable Projects in Latin America

Areva Koblitz, the Brazilian renewable energy developer that focuses on biomass and hydroelectric plants, plans projects worth 584 million reais ($327.3 million) throughout Latin America following a decline in local power prices. The company is seeking to sign contracts to build facilities with 200 megawatts of installed capacity by 2016 in the region, Commercial Director […]