The approved contracts are as follows:
- Renewable energy in the area of Aguán, which will generate 10 megawatts from biomass.
- One half megawatt renewable energy project in Copán
- Six megawatts of renewable energy in Santa Barbara.
- The replacement of valves, tubes, and repairs for the continuing overhaul of the last turbine of the Francisco Morazán dam.
You must be logged in to post a comment Login